Most Popular


Reliable 1z0-1033-24 Exam Topics - 1z0-1033-24 Exam Actual Questions Reliable 1z0-1033-24 Exam Topics - 1z0-1033-24 Exam Actual Questions
We are committed to help you pass the exam just ...
Every Area covered 1Z0-1041-21 Tested Material Every Area covered 1Z0-1041-21 Tested Material
When asked about the opinion about the exam, most people ...
CKS Dump Torrent, Latest CKS Real Test CKS Dump Torrent, Latest CKS Real Test
DOWNLOAD the newest PremiumVCEDump CKS PDF dumps from Cloud Storage ...


Maximize Your Chances of Getting CT-PT

Rated: , 0 Comments
Total visits: 4
Posted on: 04/26/25

DumpStillValid knows the importance of the ISTQB CT-PT certification exam in the field of information technology. That is why it has prepared the remarkable ISTQB CT-PT exam questions to help the aspirants pass it on the first go. The desiring candidates for the ISTQB CT-PT certificate need help to find reliable CT-PT Exam Questions study material.

ISTQB CT-PT Exam Syllabus Topics:

TopicDetails
Topic 1
  • Types of Performance Testing: This section of the exam measures the skills of Software Test Analysts and covers various approaches such as load, stress, scalability, spike, endurance, concurrency, and capacity testing. It explains how each type evaluates system behavior under different conditions, helping testers and stakeholders understand how the system handles both expected and extreme usage scenarios.
Topic 2
  • The Concept of Load Generation: This section of the exam measures the skills of Software Test Analysts and discusses how representative loads are modeled and produced to simulate user or process behavior. It explores methods such as user interface inputs, crowdsourcing, API-based calls, or protocol capture and playback, emphasizing the need for repeatable loads that accurately reflect real-world conditions.
Topic 3
  • Common Failures in Performance Testing and Their Causes: This section of the exam measures the skills of Performance Engineers and outlines frequent failure modes, including slow responses at various load levels, degraded performance over time, and system crashes under peak conditions. It provides examples of underlying causes such as resource leaks, insufficient capacity, and poor handling of spikes or concurrency, illustrating why robust planning and monitoring are crucial for reliable performance.
Topic 4
  • Testing Types in Performance Testing: This section of the exam introduces the distinction between static and dynamic performance testing. It shows how reviews of requirements, architecture, and code can identify risks before coding is complete, and how runtime checks of resource utilization and response times reveal issues that only appear when the system is in operation.

>> CT-PT Latest Exam Fee <<

Pass CT-PT Rate, Practice CT-PT Engine

The development of science and technology makes our life more comfortable and convenient, which also brings us more challenges. Many company requests candidates not only have work experiences, but also some professional certifications. Therefore it is necessary to get a professional CT-PT Certification to pave the way for a better future. The CT-PT question dumps produced by our company, is helpful for our customers to pass their exams and get the CT-PT certification within several days.

ISTQB Certified Tester - Performance Testing Sample Questions (Q33-Q38):

NEW QUESTION # 33
You are managing the testing efforts of an existing distributed system that manages inventories of automobile and light truck tires from multiple warehouses across the country. The system is being enhanced to track incoming restocking shipments at the point of entry to the warehouse and outbound sales shipments at the point of shipment from the warehouse, all of which are executed in real-time. System loads traditionally peak on Mondays due to built-up demand from the previous weekend.
You are constructing an operational profile that emulates entities that submit large, bulk orders of greater than or equal to 1600 tires per transaction. You feel the profile you are constructing accurately reflects this type of power purchaser.
Which of the following steps must you take to ensure your operational profile is accurate?

  • A. Aggregate the specific operational profiles into a single generic profile and use that generic profile for load testing.
  • B. Based on the power purchaser information, create operational profiles for low and medium purchasers and use equal proportions of those profiles during the testing.
  • C. Review and adjust the profile with key stakeholders prior to using it.
  • D. Execute the performance test with the operational profile and adjust the parameters as needed.

Answer: C

Explanation:
To ensure an accurate operational profile, it is crucial to validate and adjust it with key stakeholders before executing tests. This step ensures that the workload realistically represents actual user behavior.
Option A (Executing the test first and adjusting later) is incorrect because adjustments should be made before execution to avoid misleading results.
Option C (Aggregating profiles into a single generic profile) removes important distinctions between different user types, reducing test accuracy.
Option D (Creating separate profiles and using equal proportions) does not match the actual power purchaser behavior, which requires a realistic representation of their higher-volume transactions.


NEW QUESTION # 34
Which of the following could lead to inconsistent performance test results?

  • A. Expected results were not verified with senior management.
  • B. Sequential scripts running and attempting to access the same data.
  • C. Virtual users running the same script while logged in as the same user.
  • D. Concurrent scripts running and attempting to access the same data.

Answer: C

Explanation:
If multiple virtual users execute the same script while logged in as the same user, it can cause data conflicts, session collisions, or cache interference, leading to inconsistent performance test results.
Option A (Concurrent scripts accessing the same data) may cause data locking issues, but this is a test setup concern rather than an inconsistency issue.
Option B (Sequential scripts accessing the same data) does not typically cause inconsistencies since they execute in order.
Option D (Verification with management) is unrelated to technical inconsistencies.


NEW QUESTION # 35
Stakeholders were unhappy with previous performance test results, which indicated that the adjustments were not made fast enough and engine stall was probable. The developers have now made changes that they believe will significantly improve the performance of the adjustments.
What should you do to ensure the performance test objectives have been properly defined before you run the next set of performance tests?

  • A. Adjust stakeholder expectations to be more aligned with the reality of the previous test results.
  • B. Realign performance test objectives with business stakeholders to meet project milestone dates.
  • C. Understand the delta between the results from previous performance tests and the results from the expected performance improvements.
  • D. Realign performance test objectives with all stakeholders to meet time-to-market goals.

Answer: C

Explanation:
Before running the next set of performance tests, it is crucial to understand the differences (delta) between the previous test results and the expected improvements. This ensures that:
The changes made by developers are properly validated.
Performance objectives are aligned with measurable improvements.
Option B (Adjust stakeholder expectations) is incorrect, as performance testing should focus on real data rather than adjusting expectations.
Option C and D (Realign objectives for milestones or time-to-market goals) are incorrect because test objectives should focus on technical accuracy rather than schedule constraints.


NEW QUESTION # 36
Which of the following is a best practice to include in performance test scripts when verifying results?

  • A. Increase the number of scripts executed to provide greater coverage.
  • B. Add transaction timers to collect response times.
  • C. Verify that correct information was added to the database.
  • D. Hold the development team accountable for system performance.

Answer: C

Explanation:
One of the best practices in performance test scripting is to validate that correct data is recorded in the database after execution. This ensures that performance issues do not impact data integrity.
Option A (Increasing the number of scripts) may provide more coverage but does not verify accuracy.
Option C (Adding transaction timers) is useful for performance monitoring but does not ensure correct data entry.
Option D (Holding the development team accountable) is a management responsibility, not a scripting best practice.


NEW QUESTION # 37
During which of the principal performance testing activities are the building blocks for larger, more complex tests created?

  • A. During test design
  • B. During test planning
  • C. During test completion
  • D. During test implementation

Answer: D

Explanation:
Test implementation is the stage where smaller test components are created and assembled into larger test scenarios. This phase includes scripting, test data preparation, and configuring load profiles.
Option A (Test completion) involves analyzing results, not building tests.
Option B (Test planning) focuses on strategies and objectives, not test creation.
Option C (Test design) defines test scenarios and cases, but the actual building happens in implementation.


NEW QUESTION # 38
......

No matter who you are, I believe you can do your best to achieve your goals through our CT-PT Preparation questions! For we have three different versions of CT-PT exam materials to satisfy all your needs. The PDF version of CT-PT practice guide can be printed so that you can take it wherever you go. And the Software version can simulate the real exam environment and support offline practice. Besides, the APP online can be applied to all kind of electronic devices.

Pass CT-PT Rate: https://www.dumpstillvalid.com/CT-PT-prep4sure-review.html

Tags: CT-PT Latest Exam Fee, Pass CT-PT Rate, Practice CT-PT Engine, CT-PT Hot Questions, CT-PT Valid Braindumps


Comments
There are still no comments posted ...
Rate and post your comment


Login


Username:
Password:

Forgotten password?